Walterdale Bridge Project

Project Summary

During construction of Edmonton’s Walterdale Bridge across the North Saskatchewan River, Clearflow Gel Flocculant treatment was used to manage water generated during installation of the bridge’s piling system. The treatment program operated throughout the 2016 and 2017 construction seasons.

Water collected within the cofferdams was treated and safely returned to the river, supporting efficient site operations while helping the contractor meet environmental discharge requirements. This approach reduced water-handling delays and helped avoid costs associated with extended treatment, off-site disposal, and potential regulatory non-compliance.

Key Results

  • Supported piling and cofferdam operations throughout the 2016 and 2017 construction seasons.
  • Treated construction water directly at the project site.
  • Enabled the immediate release of treated water back to the North Saskatchewan River.
  • Improved operational efficiency by reducing water-management time and delays.
  • Generated substantial savings in operating costs and helped mitigate the risk of regulatory fines.

Do you have questions about 

Walterdale Bridge Project

Contact Us

Industry Construction
Location Alberta
Project Type Stormwater Treatment
Service Provided Application Support, Consulting, Lab Testing

Products used