Prairie Mines Project

Project Summary

The Prairie Mines Project used an in-pipe treatment system to manage stormwater inflows of up to approximately 32,000 m3 per day. Clearflow Gel Flocculant blocks were installed in series within an existing two-metre-diameter storm pipe, allowing treatment to occur directly within the established drainage infrastructure. The number of blocks could be adjusted according to anticipated peak flow conditions.

Following the in-pipe treatment stage, the water passed through a strategically positioned field of treated Jute for final polishing before being released to the surrounding wetland. This configuration provided a practical, scalable treatment approach that made use of the site’s existing stormwater system and natural discharge area.

Key Results

  • Accommodated stormwater inflows of approximately 32,000 m3 per day.
  • Integrated treatment into an existing two-metre-diameter storm pipe.
  • Allowed treatment capacity to be adjusted based on peak flow requirements.
  • Added a treated Jute dispersion field for final water polishing.
  • Enabled controlled release of treated water to the receiving wetland.

Do you have questions about 

Prairie Mines Project

Contact Us

Industry Mining
Location Alberta
Project Type Stormwater Treatment
Service Provided Application Support, Consulting, Lab Testing

Products used