A newly constructed subdivision in the Town of Innisfil required an effective treatment solution to reduce total suspended solids (TSS) in stormwater before it was discharged to a downstream lake. Protecting water quality and aquatic life was a central requirement for the project.

Clearflow Gel Block Flocculants were installed directly within the subdivision’s existing stormwater pipes. The passive treatment system was positioned strategically upstream of the water-management ponds, allowing stormwater to be treated as it flowed through the drainage network. Under normal and medium-flow conditions, sediment accumulated approximately 50 metres below the treatment system, accelerating flocculation and colloidal settling before discharge.

Key Results

  • Reduced total suspended solids in subdivision stormwater.
  • Integrated treatment into the existing stormwater infrastructure without a separate mechanical dosing system.
  • Provided passive treatment during normal and medium-flow conditions.
  • Accelerated flocculation and settling of fine colloidal material.
  • Helped protect the downstream lake and aquatic environment.

Do you have questions about 

City of Innisfil Project

Contact Us

Industry Municipal
Location Alberta
Project Type Stormwater Treatment
Service Provided Application Support, Consulting, Lab Testing

Products used